If you've created a draft invoice and timesheets or costs have since been entered against the related job, you can load these new items straight into your existing draft invoice. You don't need to create a new invoice to capture them.
To do this:
- Open the draft invoice.
- Click Options
- Select Load new Timesheets/Costs
- In the pop-up window, click Proceed
New timesheets are added to the relevant tasks in the invoice, and new costs are added in the same way.